CCW Awarded Contract for Deck Maintenance/Repairs at Aspen Village HOA

Central Coast Waterproofing was recentlyawarded the contract to provide cleaning and resealing services                              to Aspen Village HOA, located in Arroyo Grande.

The 18 decks, protected by Mer-Kote’s Weatherdeck system, will be cleaned and repaired before a UV resistant protective color coat is applied. These systems can easily last 20-30 years with proper maintenance.

The HOA’s maintenance reserve account will be used to pay for the repairs and sealing.

Mer-Kote Weatherdeck is a slip sheet system that is a pedestrian traffic coating that needs to be resealed for optimum life about every 3-5 years. See Mer-Ko’s website for more information on these systems and their proper maintenance and care.

Work is scheduled to begin in mid-May and is expected to be completed in 5-7 work days.

For your deck repairs, maintenance and installations, call the Deck Expert, Bill Leys at

805-545-8300

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s